StadiumDesigner
American football challenge · Hard

Relocation

A pro franchise is moving to town and all you have is the high-school field. Build them a home.

Seats 65,000 Budget $2.00bn Level Hard

The target: 65,000 seats on a $2.00bn budget. Each goal you meet earns a star, but only while the build stays within the $2.00bn budget.

3D view of Millbrook Field, where this challenge starts
Starting point: Millbrook Field

The three stars

  1. Star 1

    65,000+ seats, all covered

    At least 65,000 seats in the ground. Every seat drawn in the plan is counted. Every seat sits under a roof.

    How to hit it: The starting ground holds 6,888, so you need about 58,112 more. A standard seat costs about $11k to build (a little more in the corners), a bench place $1,100, so extra rows or a second tier on the long stands is the cheapest way up. A cantilever roof costs about $2,600 per square metre of cover. Roof every stand, including any filled corners.

  2. Star 2

    Noise ≥ 82

    The crowd-noise rating reaches 82 out of 100 on game day.

    How to hit it: Noise builds with a closed bowl (all four sides built, corners filled), steep rakes, roofs, bench and bleacher sections, a big crowd and stands built tight to the field. A dome (Pro) keeps the most in.

  3. Star 3

    120+ suites

    At least 120 suites (private boxes) around the bowl.

    How to hit it: Suites cost about $2.5m each, so 120 of them come to $300m before anything else. Line both sideline stands first.

Where you start

The challenge opens on Millbrook Field, home of Millbrook Eagles. You need to find about 58,112 more seats.

Capacity
6,888
Build cost
$20.0m
Budget
$2.00bn
Stars at the start
★★★

Ready? Open the gates.

The editor checks the goals live as you build: capacity, cost, sightlines, egress and the game day sim all update with every change.

Start this challenge

More challenges

Rules of thumb, not a compliance check.