Seats ≤ 25,000 Budget £130.0m Level Medium

The target: 25,000 seats at most on a £130.0m budget. Each goal you meet earns a star, but only while the build stays within the £130.0m budget.

3D view of The Kiln, where this challenge starts
Starting point: The Kiln

The three stars

  1. Star 1

    Atmosphere ≥ 90 at ≤ 25,000

    The atmosphere rating reaches 90 out of 100, with no more than 25,000 seats.

    How to hit it: Atmosphere rises with steeper rakes (up to the 35° limit), roofs that keep the noise in, safe standing, filled-in corners and stands built tight to the pitch.

  2. Star 2

    Clear sightlines (C ≥ 90)

    Every tier has a C-value of at least 90: each fan's eye line clears the head of the person in front by 90 mm or more. C 90 is the comfortable benchmark; below 60 is an error.

    How to hit it: Steepen the rake on any tier that falls short, or raise its front row. Long, shallow tiers are the usual culprits.

  3. Star 3

    Safe standing ≥ 5,000

    At least 5,000 safe-standing places (rail seats).

    How to hit it: Switch a whole end or tier to safe standing: a place costs about £2,600, against £3,800 for a standard seat, and it lifts the atmosphere too.

Where you start

The challenge opens on The Kiln, home of Redbrook Rovers.

Capacity
23,881
Build cost
£128.8m
Budget
£130.0m
Stars at the start
★★★

Ready? Open the gates.

The editor checks the goals live as you build: capacity, cost, sightlines, egress and the matchday sim all update with every change.