Ottermill are in the county league. Get everyone dry and get the toilet queue down.

Seats 4,500 Budget £45.0m Level Easy

The target: 4,500 seats on a £45.0m budget. Each goal you meet earns a star, but only while the build stays within the £45.0m budget.

Part of the Pro campaign. Pro unlocks all 14 campaign steps, every prop pack and unlimited saves for a one-time $17. See Pro

3D view of Ottermill Rec, where this challenge starts
Starting point: Ottermill Rec

The three stars

  1. Star 1

    4,500+ seats

    At least 4,500 seats in the ground. Every seat drawn in the plan is counted.

    How to hit it: The starting ground holds 4,044, so you need about 456 more. A standard seat costs about £3,800 to build (a little more in the corners), so extra rows or a second tier on the long stands is the cheapest way up.

  2. Star 2

    Every seat covered

    Every seat sits under a roof.

    How to hit it: A cantilever roof costs about £1,800 per square metre of cover. Roof every stand, including any filled corners.

  3. Star 3

    Toilets ≤ 1:70

    No more than 70 fans per toilet.

    How to hit it: At 4,500 seats that's at least 65 toilets, at about £9,000 each.

Where you start

The challenge opens on Ottermill Rec, home of Ottermill Wanderers. You need to find about 456 more seats.

Capacity
4,044
Build cost
£37.7m
Budget
£45.0m
Stars at the start
★★★

Ready? Open the gates.

The editor checks the goals live as you build: capacity, cost, sightlines, egress and the matchday sim all update with every change.