StadiumDesigner
Pro campaign · step 7 of 14 · Medium Pro

First concert

A promoter has called. Make the summer gig worth the pitch repairs.

Seats 20,000 Budget £150.0m Level Medium

The target: 20,000 seats on a £150.0m budget. Each goal you meet earns a star, but only while the build stays within the £150.0m budget.

Part of the Pro campaign. Pro unlocks all 14 campaign steps, every prop pack and unlimited saves for a one-time $17. See Pro

3D view of Ottermill Park, where this challenge starts
Starting point: Ottermill Park

The three stars

  1. Star 1

    Concert gross ≥ £2.2m

    A sold-out concert night takes at least £2.2m: tickets for the pitch floor and the seats, plus what fans spend inside.

    How to hit it: It scales with capacity, but seats behind the stage can't be sold, so add seats in the side stands and corners. A fan-zone plaza (Pro) lifts spending.

  2. Star 2

    Acoustics ≥ 85

    The concert-night acoustics rating reaches 85 out of 100.

    How to hit it: Sound stays in when the seats are covered, so roof the whole bowl first. Plenty of hospitality boxes and a retractable roof (Pro) add more.

  3. Star 3

    Matchday score ≥ 82

    The matchday sim's overall score reaches 82 out of 100. It blends atmosphere, fan comfort, how fast the ground empties, sightlines and the half-time queue.

    How to hit it: Atmosphere carries the most weight; after that, fix whichever matchday reading is weakest. Open the gates after each change to watch the score move.

Where you start

The challenge opens on Ottermill Park, home of Ottermill Wanderers. You need to find about 5,888 more seats.

Capacity
14,112
Build cost
£92.1m
Budget
£150.0m
Stars at the start
★★★

Ready? Open the gates.

The editor checks the goals live as you build: capacity, cost, sightlines, egress and the matchday sim all update with every change.

Start this challenge Pro

More challenges

Rules of thumb, not a compliance check.