StadiumDesigner
Pro campaign · step 6 of 14 · Medium Pro

Close the corners

Fill the gaps and trap the noise in.

Seats 15,000 Budget £115.0m Level Medium

The target: 15,000 seats on a £115.0m budget. Each goal you meet earns a star, but only while the build stays within the £115.0m budget.

Part of the Pro campaign. Pro unlocks all 14 campaign steps, every prop pack and unlimited saves for a one-time $17. See Pro

3D view of Ottermill Park, where this challenge starts
Starting point: Ottermill Park

The three stars

  1. Star 1

    All four corners filled

    All four corners are filled in with seating.

    How to hit it: Corner seats cost a little more, but they close the bowl, adding seats and atmosphere.

  2. Star 2

    Atmosphere ≥ 88

    The atmosphere rating reaches 88 out of 100.

    How to hit it: Atmosphere rises with steeper rakes (up to the 35° limit), roofs that keep the noise in, safe standing, filled-in corners and stands built tight to the pitch.

  3. Star 3

    Clear sightlines (C ≥ 90)

    Every tier has a C-value of at least 90: each fan's eye line clears the head of the person in front by 90 mm or more. C 90 is the comfortable benchmark; below 60 is an error.

    How to hit it: Steepen the rake on any tier that falls short, or raise its front row. Long, shallow tiers are the usual culprits.

Where you start

The challenge opens on Ottermill Park, home of Ottermill Wanderers. You need to find about 888 more seats.

Capacity
14,112
Build cost
£92.1m
Budget
£115.0m
Stars at the start
★★★

Ready? Open the gates.

The editor checks the goals live as you build: capacity, cost, sightlines, egress and the matchday sim all update with every change.

Start this challenge Pro

More challenges

Rules of thumb, not a compliance check.