StadiumDesigner
Pro campaign · step 14 of 14 · Expert Pro

Final venue

The cup final is coming to Ottermill. Build the showpiece.

Seats 65,000 Budget £520.0m Level Expert

The target: 65,000 seats on a £520.0m budget. Each goal you meet earns a star, but only while the build stays within the £520.0m budget.

Part of the Pro campaign. Pro unlocks all 14 campaign steps, every prop pack and unlimited saves for a one-time $17. See Pro

3D view of Ottermill Park, where this challenge starts
Starting point: Ottermill Park

The three stars

  1. Star 1

    65,000+ seats

    At least 65,000 seats in the ground. Every seat drawn in the plan is counted.

    How to hit it: The starting ground holds 25,079, so you need about 39,921 more. A standard seat costs about £3,800 to build (a little more in the corners), so extra rows or a second tier on the long stands is the cheapest way up.

  2. Star 2

    Halo roof, C ≥ 90 everywhere

    At least one stand has a halo roof (Pro). Every tier has a C-value of at least 90: each fan's eye line clears the head of the person in front by 90 mm or more. C 90 is the comfortable benchmark; below 60 is an error.

    How to hit it: A halo roof costs about £2,900 per square metre of cover. Steepen the rake on any tier that falls short, or raise its front row. Long, shallow tiers are the usual culprits.

  3. Star 3

    5% hospitality, score ≥ 85

    Hospitality covers (boxes and premium seats) add up to at least 5% of the capacity. The matchday sim's overall score reaches 85 out of 100. It blends atmosphere, fan comfort, how fast the ground empties, sightlines and the half-time queue.

    How to hit it: At 65,000 seats that's 3,250 covers. Boxes cost about £450k each; premium seats about £6,500 each. Atmosphere carries the most weight; after that, fix whichever matchday reading is weakest. Open the gates after each change to watch the score move.

Where you start

The challenge opens on Ottermill Park, home of Ottermill Wanderers. You need to find about 39,921 more seats.

Capacity
25,079
Build cost
£164.0m
Budget
£520.0m
Stars at the start
★★★

Ready? Open the gates.

The editor checks the goals live as you build: capacity, cost, sightlines, egress and the matchday sim all update with every change.

Start this challenge Pro

More challenges

Rules of thumb, not a compliance check.