Championship standard

Up again. 30,000 in, and out again before the trains stop.

Seats 30,000 Budget £210.0m Level Hard

The target: 30,000 seats on a £210.0m budget. Each goal you meet earns a star, but only while the build stays within the £210.0m budget.

Part of the Pro campaign. Pro unlocks all 14 campaign steps, every prop pack and unlimited saves for a one-time $17. See Pro

3D view of Ottermill Park, where this challenge starts
Starting point: Ottermill Park

The three stars

  1. Star 1

    30,000+ seats

    At least 30,000 seats in the ground. Every seat drawn in the plan is counted.

    How to hit it: The starting ground holds 25,079, so you need about 4,921 more. A standard seat costs about £3,800 to build (a little more in the corners), so extra rows or a second tier on the long stands is the cheapest way up.

  2. Star 2

    Empties in ≤ 6 min

    A full house is out of the ground within 6 minutes of the final whistle.

    How to hit it: Each 2.4 m gate lets out about 158 fans a minute, so 30,000 seats need at least 32 gates. Gates cost about £120k each.

  3. Star 3

    Kiosks ≤ 1:250

    No more than 250 fans per food-and-drink kiosk.

    How to hit it: At 30,000 seats that's at least 120 kiosks, at about £60k each.

Where you start

The challenge opens on Ottermill Park, home of Ottermill Wanderers. You need to find about 4,921 more seats.

Capacity
25,079
Build cost
£164.0m
Budget
£210.0m
Stars at the start
★★★

Ready? Open the gates.

The editor checks the goals live as you build: capacity, cost, sightlines, egress and the matchday sim all update with every change.

Start this challenge Pro

More challenges